Follow
Martín Gómez Ravetti
Martín Gómez Ravetti
Universidade Federal de Minas Gerais - Department of Computer Science
Verified email at ufmg.br - Homepage
Title
Cited by
Cited by
Year
Quantification of network structural dissimilarities
TA Schieber, L Carpi, A Díaz-Guilera, PM Pardalos, C Masoller, ...
Nature communications 8 (1), 13928, 2017
2522017
Exact algorithms for a scheduling problem with unrelated parallel machines and sequence and machine-dependent setup times
PL Rocha, MG Ravetti, GR Mateus, PM Pardalos
Computers & Operations Research 35 (4), 1250-1264, 2008
1892008
Uncovering molecular biomarkers that correlate cognitive decline with the changes of hippocampus' gene expression profiles in Alzheimer's disease
M Gomez Ravetti, OA Rosso, R Berretta, P Moscato
PloS one 5 (4), e10153, 2010
1812010
Identification of a 5-protein biomarker molecular signature for predicting Alzheimer's disease
M Gómez Ravetti, P Moscato
PloS one 3 (9), e3111, 2008
1542008
Solving parallel machines scheduling problems with sequence-dependent setup times using variable neighbourhood search
MR De Paula, MG Ravetti, GR Mateus, PM Pardalos
IMA Journal of Management Mathematics 18 (2), 101-115, 2007
1262007
Causality and the entropy–complexity plane: Robustness and missing ordinal patterns
OA Rosso, LC Carpi, PM Saco, MG Ravetti, A Plastino, HA Larrondo
Physica A: Statistical Mechanics and its Applications 391 (1-2), 42-55, 2012
1052012
Distinguishing noise from chaos: objective versus subjective criteria using horizontal visibility graph
MG Ravetti, LC Carpi, BA Gonçalves, AC Frery, OA Rosso
PloS one 9 (9), e108004, 2014
1042014
A hybrid Lagrangian metaheuristic for the cross-docking flow shop scheduling problem
GB Fonseca, TH Nogueira, MG Ravetti
European Journal of Operational Research 275 (1), 139-154, 2019
712019
A branch and price algorithm to solve the integrated production planning and scheduling in bulk ports
GC Menezes, GR Mateus, MG Ravetti
European Journal of Operational Research 258 (3), 926-937, 2017
672017
Robust coordination of directional overcurrent relays using a matheuristic algorithm
MH Costa, RR Saldanha, MG Ravetti, EG Carrano
IET Generation, Transmission & Distribution 11 (2), 464-474, 2017
582017
Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration
GR Mateus, MG Ravetti, MC de Souza, TM Valeriano
Journal of Scheduling 13, 245-259, 2010
582010
Time-indexed formulation and polynomial time heuristic for a multi-dock truck scheduling problem in a cross-docking centre
PM Cota, BMR Gimenez, DPM Araújo, TH Nogueira, MC de Souza, ...
Computers & Industrial Engineering 95, 135-143, 2016
542016
Differences in abundances of cell-signalling proteins in blood reveal novel biomarkers for early detection of clinical Alzheimer's disease
M Rocha de Paula, M Gómez Ravetti, R Berretta, P Moscato
PloS one 6 (3), e17481, 2011
512011
Time series characterization via horizontal visibility graph and Information Theory
BA Gonçalves, L Carpi, OA Rosso, MG Ravetti
Physica A: Statistical Mechanics and its Applications 464, 93-102, 2016
492016
Assessing diversity in multiplex networks
LC Carpi, TA Schieber, PM Pardalos, G Marfany, C Masoller, ...
Scientific reports 9 (1), 4511, 2019
472019
A scheduling problem with unrelated parallel machines and sequence dependent setups
MG Ravetti, GR Mateus, PL Rocha, PM Pardalos
International Journal of Operational Research 2 (4), 380-399, 2007
462007
A hierarchical approach to solve a production planning and scheduling problem in bulk cargo terminal
GC Menezes, GR Mateus, MG Ravetti
Computers & Industrial Engineering 97, 1-14, 2016
432016
The Amigó paradigm of forbidden/missing patterns: a detailed analysis
OA Rosso, LC Carpi, PM Saco, MG Ravetti, HA Larrondo, A Plastino
The European Physical Journal B 85, 1-12, 2012
432012
Analyzing complex networks evolution through Information Theory quantifiers
LC Carpi, OA Rosso, PM Saco, MG Ravetti
Physics Letters A 375 (4), 801-804, 2011
432011
Analysis of mixed integer programming formulations for single machine scheduling problems with sequence dependent setup times and release dates
TH Nogueira, CRV Carvalho, MG Ravetti, MC Souza
Pesquisa Operacional 39, 109-154, 2019
412019
The system can't perform the operation now. Try again later.
Articles 1–20