Follow
Mariano Frutos
Mariano Frutos
Investigador/Researcher (IIESS UNS-CONICET), Profesor/Professor (DI-UNS)
Verified email at uns.edu.ar - Homepage
Title
Cited by
Cited by
Year
Industry 4.0: smart scheduling
DA Rossit, F Tohmé, M Frutos
International Journal of Production Research 57 (12), 3802-3813, 2019
2822019
Metaheuristics in water, geotechnical and transport engineering
XS Yang, AH Gandomi, S Talatahari, AH Alavi
Newnes, 2012
1512012
The non-permutation flow-shop scheduling problem: a literature review
DA Rossit, F Tohmé, M Frutos
Omega 77, 143-153, 2018
1222018
Guía para la elaboración de estudios del medio físico
M Aguilo, MP Aramburu, A Blanco, T Calatayud, GR Carrasco, G Castilla, ...
MOPT. Madrid, 1992
1121992
A memetic algorithm based on a NSGAII scheme for the flexible job-shop scheduling problem
M Frutos, AC Olivera, F Tohmé
Annals of Operations Research 181 (1), 745-765, 2010
922010
Production planning and scheduling in Cyber-Physical Production Systems: a review
DA Rossit, F Tohme, M Frutos
International journal of computer integrated manufacturing 32 (4-5), 385-395, 2019
892019
Meta-heuristics optimization algorithms in engineering, business, economics, and finance
PM Vasant
IGI Global, 2012
892012
A data-driven scheduling approach to smart manufacturing
DA Rossit, F Tohmé, M Frutos
Journal of Industrial Information Integration 15, 69-79, 2019
812019
Real-world applications of genetic algorithms
O Roeva
BoD–Books on Demand, 2012
712012
Handbook of research on modern optimization algorithms and applications in engineering and economics
P Vasant
IGI Global, 2016
602016
Computer game to learn and enhance speech problems for children with autism
M Frutos, I Bustos, BG Zapirain, AM Zorrilla
2011 16th international conference on computer games (CGAMES), 209-216, 2011
512011
An Industry 4.0 approach to assembly line resequencing
DA Rossit, F Tohmé, M Frutos
The International Journal of Advanced Manufacturing Technology 105, 3619-3630, 2019
432019
Visual attractiveness in routing problems: A review
DG Rossit, D Vigo, F Tohmé, M Frutos
Computers & Operations Research 103, 13-34, 2019
342019
Strategic Planning in a Forest Supply Chain: a multi-goal and multi-product approach
D Broz, G Durand, DA Rossit, M Frutos, F Tohmé
Canadian Journal of Forest Research, 2016
282016
A non-permutation flowshop scheduling problem with lot streaming: A Mathematical model
DA Rossit, F Tohmé, M Frutos, J Bard, D Broz
International Journal of Industrial Engineering Computations 7 (3), 507-516, 2016
282016
Bio-Inspired Systems: Computational and Ambient Intelligence: 10th International Work-Conference on Artificial Neural Networks, IWANN 2009, Salamanca, Spain, June 10-12, 2009 …
J Cabestany, F Sandoval, A Prieto, JMC Rodríguez
Springer, 2009
262009
Solving a multi-objective manufacturing cell scheduling problem with the consideration of warehouses using a simulated annealing based procedure
A Toncovich, D Rossit, M Frutos
International Journal of Industrial Engineering Computations 10 (1), 1-16, 2019
202019
Application of a methodology to design a municipal waste pre-collection network in real scenarios
A Cavallin, DG Rossit, V Herran Symonds, DA Rossit, M Frutos
Waste Management & Research 38 (1_suppl), 117-129, 2020
172020
A New Approach to the Optimization of the CVRP through Genetic Algorithms
M Frutos, F Tohmé
American Journal of Operations Research 2 (4), 495, 2012
172012
An application of the augmented ε-constraint method to design a municipal sorted waste collection system
DG Rossit, FA Tohmé, M Frutos, DR Broz
Growing Science, 2017
142017
The system can't perform the operation now. Try again later.
Articles 1–20