Follow
Daniel Alejandro Rossit
Daniel Alejandro Rossit
Engineering Department, Universidad Nacional del Sur - INMABB CONICET
Verified email at uns.edu.ar
Title
Cited by
Cited by
Year
Industry 4.0: smart scheduling
DA Rossit, F Tohmé, M Frutos
International Journal of Production Research 57 (12), 3802-3813, 2019
2822019
The non-permutation flow-shop scheduling problem: a literature review
DA Rossit, F Tohmé, M Frutos
Omega 77, 143-153, 2018
1222018
Production planning and scheduling in Cyber-Physical Production Systems: a review
DA Rossit, F Tohme, M Frutos
International journal of computer integrated manufacturing 32 (4-5), 385-395, 2019
882019
A data-driven scheduling approach to smart manufacturing
DA Rossit, F Tohmé, M Frutos
Journal of Industrial Information Integration 15, 69-79, 2019
802019
Scheduling research contributions to Smart manufacturing
D Rossit, F Tohmé
Manufacturing Letters 15, 111-114, 2018
562018
An Industry 4.0 approach to assembly line resequencing
DA Rossit, F Tohmé, M Frutos
The International Journal of Advanced Manufacturing Technology 105, 3619-3630, 2019
432019
Mass customized/personalized manufacturing in Industry 4.0 and blockchain: Research challenges, main problems, and the design of an information architecture
ATE Perez, DA Rossit, F Tohme, OC Vasquez
Information Fusion 79, 44-57, 2022
422022
A Big Data approach to forestry harvesting productivity
DA Rossit, A Olivera, VV Céspedes, D Broz
Computers and Electronics in Agriculture 161, 29-52, 2019
302019
The Argentinian forest sector: opportunities and challenges in supply chain management
D Broz, DA Rossit, DG Rossit, C Cavallin
Uncertain Supply Chain Management 6 (4), 375-392, 2018
282018
Strategic planning in a forest supply chain: a multigoal and multiproduct approach
D Broz, G Durand, D Rossit, F Tohmé, M Frutos
Canadian Journal of Forest Research 47 (3), 297-307, 2017
282017
A non-permutation flowshop scheduling problem with lot streaming: A Mathematical model
D Rossit, F Tohmé, M Frutos, J Bard, D Broz
International Journal of Industrial Engineering Computations 7 (3), 507-516, 2016
282016
Solving a multi-objective manufacturing cell scheduling problem with the consideration of warehouses using a simulated annealing based procedure
A Toncovich, DA Rossit, M Frutos, DG Rossit
International Journal of Industrial Engineering Computations 10 (1), 1-16, 2019
202019
Application of a methodology to design a municipal waste pre-collection network in real scenarios
A Cavallin, DG Rossit, V Herran Symonds, DA Rossit, M Frutos
Waste Management & Research 38 (1_suppl), 117-129, 2020
172020
Scheduling in cloud manufacturing systems: Recent systematic literature review
A Halty, R Sánchez, V Vázquez, V Viana, P Pineyro, DA Rossit
American Institute of Mathematical Sciences, 2020
142020
A combinatorial analysis of the permutation and non-permutation flow shop scheduling problems
DA Rossit, ÓC Vásquez, F Tohmé, M Frutos, MD Safe
European Journal of Operational Research 289 (3), 841-854, 2021
132021
STRATEGIC ANALYSIS OF FOREST INVESTMENTS USING REAL OPTION: THE FUZZY PAY-OFF MODEL (FPOM).
GS Milanesi, D Broz, F Tohmé, D Rossit
Fuzzy economic review 19 (1), 2014
112014
Solving a flow shop scheduling problem with missing operations in an Industry 4.0 production environment
DA Rossit, A Toncovich, DG Rossit, S Nesmachnow
Journal of Project Management 6, 33-44, 2021
102021
Warehouse Management Problem and a KPI Approach: a Case Study
M Marziali, DA Rossit, A Toncovich
Management and Production Engineering Review, 2021
102021
Proposal and comparative study of evolutionary algorithms for optimum design of a gear system
M Mendez, DA Rossit, B González, M Frutos
IEEE Access 8, 3482-3497, 2019
102019
Lot streaming flow shop with a heterogeneous machine
A Ferraro, D Rossit, A Toncovich, M Frutos
Engineering Management Journal 31 (2), 113-126, 2019
82019
The system can't perform the operation now. Try again later.
Articles 1–20